• Home
  • Factory
  • 2025 SMX Manila Solar Expo: How JZD is Solving Solar Energy Challenges in Philippines

2025 SMX Manila Solar Expo: How JZD is Solving Solar Energy Challenges in Philippines

JZD capture with clients

The 2025 SMX Manila Solar Expo provided a critical platform to engage with the Philippines’ rapidly growing renewable energy sector. Over three days, our team connected with 850+ industry professionals, including EPC contractors, utility representatives, and government regulators. This recap outlines key discussions around our core product lines and their alignment with local market demands.


​1. Solar Cable Solutions for Typhoon Resilience

​Market Challenge​​:
With an average of 20 annual typhoons causing $150M+ in solar infrastructure damage (PAGASA 2023 data), durability remains a top concern.

​On-Site Validation​​:

  • ​Live Testing​​: Our IEC 62930-certified solar cables underwent rigorous typhoon simulation (200 km/h winds + saltwater spray) at the booth. Engineers from Solar Philippines noted zero insulation cracks after 72 continuous test cycles.
  • ​Project Application​​: A case study with GreenVolt Engineering demonstrated how these cables reduced post-typhoon repair costs by 40% in a 10MW Mindanao solar farm.4mm 6mm Solar PV Cable

​2. Flat NM Wire: Addressing Urban Safety Standards​

​Regulatory Context​​:
The Philippines’ Fire Code (RA 9514) now mandates 90°C-rated wiring for commercial buildings, a standard 34% of local suppliers fail to meet (DTI Q1 2024 report).

​Expo Focus​​:

  • ​Technical Specifications​​: Our flat NM-90 wire’s 2.8mm profile and 90°C thermal rating drew attention from Manila developers managing space-constrained high-rises.
  • ​Compliance Advantage​​: Test results from the University of Santo Tomas’ engineering lab showed our wire maintained integrity after 1,200 hours at 95°C, exceeding fire safety requirements.

nm-wire


​​3. SPT Cable & Royal Cord: Powering Commercial Reliability​​

​SPT-2 Cable in Food Sector Applications​​:

  • ​Problem​​: 63% of Philippine food retailers report refrigeration failures from corroded power cords (DOE 2023 Energy Efficiency Survey).
  • ​Solution​​: Exhibited SPT-2 cables with oil/acid-resistant jackets are now being trialed by Puregold Supermarket for walk-in freezer installations.

​Royal Cord Industrial Validation​​:

  • ​Durability Test​​: A Cavite-based manufacturer stress-tested our 12AWG Royal Cord with 5hp pumps in flood simulation conditions. After 500 operational hours, conductivity remained within 1% variance of initial performance.

SPT-Cable

 

Royal cord


​4. Policy Alignment & Next Steps​

​Strategic Compliance​​:

  • Our solar cable portfolio meets the new DER Grid Code (ERC Resolution No. 05, 2024) for seamless renewable integration.
  • The Flat NM Wire is included in DTI’s 2024 List of Approved Building Materials.

​2025 Commitments​​:

  • ​Q3 Launch​​: Manila Technical Service Center will provide free cable sizing consultations and localized product testing.
  • ​Q4 Training​​: Partnering with TESDA to certify 150+ installers on high-voltage solar cable safety protocols.

​5. Conclusion & Forward Vision​

​A Shared Commitment to Energy Resilience​
The 2025 SMX Manila Solar Expo underscored a critical truth: The Philippines’ clean energy transition demands more than technical specs—it requires solutions born from local collaboration. By combining our globally tested expertise with on-ground insights from partners like GreenVolt Engineering and Solar Philippines, we’re bridging the gap between typhoon-ready infrastructure and national renewable targets.

​2025 Milestones Achieved​​:

  • Validated solar cable durability under extreme Philippine weather conditions
  • Secured partnerships with 23 local EPC contractors for urban and off-grid projects
  • Aligned product roadmap with DOE’s 2030 solar roadmap and ERC grid codes

​Looking Ahead: 2026 Strategic Priorities​

  1. ​Local Empowerment​​: Inaugurating our Manila Technology Center in October 2026 to provide:
    • Free cable stress-testing using Manila Bay seawater and volcanic ash simulations
    • On-demand training for TESDA-accredited solar technicians
  2. ​Innovation Pipeline​​: Developing hybrid cables integrating solar transmission + EV charging capabilities for mall/resort applications
  3. ​Policy Advocacy​​: Partnering with IEAP (Institute of Electrolysis and Applied Power) to draft national standards for coastal solar installations

​6. Leadership & Partnership in Focus​

​Photo Caption​​:
“JZD Cable Managing Director Linda and Engr. Maria Santos of Cebu SolarTech finalize a 3-year solar cable supply agreement at the SMX Expo. The partnership will support 12 island electrification projects in the Visayas region.”

photos with Client

Send inquiry

Cart
  • Your cart is empty Browse Shop
    Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
    • Image
    • SKU
    • Rating
    • Price
    • Stock
    • Availability
    • Add to cart
    • Description
    • Content
    • Weight
    • Dimensions
    • Additional information
    Click outside to hide the comparison bar
    Compare